After an hour of pushing and pulling the
piece of roof plastic we got it up! Next is
making sure the door opening was in the
right place. The sides were even and the
back was tucked in the right place.
Next was adding the door extra cover to
make sure there is no draft.
Then to tape the plastic in place, tucking
in the corners and taping them. This will
hold until we get the tarp over it to tie
down.
Next was put in the new heavy duty
electrical box to make sure all the
lights, fan and heater will be supported
with a surge protector. Next is to add
the plants!
A look into the Brug House before
they get put away. Northeast corner
Northwest corner
South West Corner
South East Corner
A look into the Greenhouse after a couple
days of putting some of the plants in here
for safe keeping.
Once they are full no one is allowed inside!!